TM-9-2350-277-20-5

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 5 OF 6

  TM-9-2350-277-20-5 - Page 136 of 1047

TM 9-2350-277-20-5
REPLACE TUBE FROM RAMP CONTROL VALVE TO BULKHEAD
0664 00
THIS WORK PACKAGE COVERS:
Removal (page 0664 00-1).
Installation (page 0664 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Locknut (3)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Driver’s power plant access panel
removed (see your -10)
Left front floor plate removed (WP 0453 00)
REMOVAL
NOTE
There are two types of ramp control valves. One has an internal relief valve and the other has
an external relief valve. The tube on the ramp control valve with external relief valve is
attached to a tee fitting. The tube on the ramp control valve with internal relief valve is attached
to an elbow fitting.
1.
Remove three locknuts (1), screws (2), washers (3), and clamps (4) from power plant compartment bulkhead. Discard
locknuts.
2.
Remove clamps (4) from tube (5).
0664 00-1


Back to Top