b. Installation
Ensure engine and exhaust systems are cool enough to permit handling in order to
prevent bums.
1 Install exhaust pipe insulation covers(18 and 19) with three clamps (17) on exhaust pipe (20). Torque three
clamps to 15-25 lb-in. (1.7-2.8 N*m).
2 Install muffler insulation covers(14 and 15) with four clamps(16) and one large clamp(11 ). Torque five clamps
(16 and 11) to 15-25 lb-in. (1 .7-2.8 Nžm).
3 Install insulation covers(12 and 13) with two large clamps (10). Torque two clamps (10) to 15-25 lb-in. (1.7-
2.8 N•m).
4 Install hangar (9), two springs (8), two washers (7), and two screws (6).
5 Install exhaust duct (5).
6 Connect two springs (4).
Step 7 applies only to some M109A3 Howitzers.
7 Install buffer plate (3), two new Iockwashers (2), and two screws(1).
NOTE
FOLLOW-ON MAINTENANCE:
Install powerplant (para 4-5)
TM9-2350-311-20-1
6-43
NOTE
WARNING