TM-9-2510-247-13-P

FIFTH WHEEL TOWING DEVICE MODEL 250M

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL, REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2004

  TM-9-2510-247-13-P - Page 326 of 522

TM 9-2510-247-13&P
0071 00
INSTALLATION
1.
Install new weather strip (7).
2.
Repeat step 1 for remaining tool box door (8).
3.
Position tool box (6) on fender and secure with six screws (1), flatwashers (2), flatwashers (3),
new lockwashers (4), and nuts (5).
Figure 121.
Tool Box
Follow-on Tasks:
None.
0071 00-4
END OF WORK PACKAGE


Back to Top