TM 9-2510-247-13&P
0005 00
UNFOLDING FROM SHIPPING/STORAGE CONFIGURATION - Continued
4. Using valve control levers, EXTEND LEFT OUT and EXTEND RIGHT OUT,
fully extend boom extensions.
5. Using
valve control levers, MAST RETRACT until arrow (1) at pivot pin hole
is aligned with arrow (2) on mast.
Figure 16.
Hydraulic Control Levers and Pin alignment
6. Insert both pivot pins (3) (do not insert spring clips into pivot pins) and remove both clevises (4)
from mast.
0005 00-3