TM 9-2520-270-34
Corrective action:
1. REMOVE COOLANT AND TIME DELAY VALVE
ASSEMBLY, See task REPLACE COOLANT AND TIME
DELAY VALVE ASSEMBLY, page 4-404,
2. REPAIR COOLANT AND TIME DELAY VALVE
ASSEMBLY, page 4-415.
1, Install coolant and time delay valve assembly, See task
REPLACE COOLANT AND TIME DELAY VALVE
ASSEMBLY, page 4-404.
2. Install priority valve piston. See task REPLACE
PRIORITY VALVE PISTON, page 4-61.
3. Install right-hand output housing, See task REPLACE
RIGHT-HAND OUTPUT HOUSING, page 4-270.
4. Install left-hand output housing, See task REPLACE
LEFT-HAND OUTPUT HOUSING, page 4-314.
5. Assemble transmission. See task INSPECT
TRANSMISSION FOR CONTAMINATIO N
, page 4-67.
END OF TREE
Change 1
2-29
1. PERFORM CORRECTIVE ACTIONS RECORDED ON
DA
FORM
2404.
2.
WAS MAIN HOUSING ASSEMBLY CLEANED?
page 4-155.