TM-9-2815-220-24

AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL FOR AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

  TM-9-2815-220-24 - Page 1416 of 1563

TM 9-2815-220-24
FUEL INJECTION PUMP BASE REPLACEMENT
0163 00
REMOVAL (Continued)
2. Remove O-ring.
a. Remove and discard O-ring (4) from crankcase.
4
CLEANING
1. See Work Package 0028 for Standard Cleaning Procedures.
INSPECTION
All parts must be inspected with care.
Replace parts if damage or wear exceeds allowable
limits.
1. See Work Package 0028 for Standard Inspection Procedures.
2. Inspect parts for damage and replace as required.
WP 0163 00-2


Back to Top