TM 9-6920-430-14
CHAPTER 1
INTRODUCTION
Section I. GENERAL
1.1 PURPOSE AND SCOPE.
The purpose of this manual is to provide instructions for
operating and maintaining the Battery Charger, PP-7309/T, and the Coolant Recharging
Unit, M80, referenced in this manual as the Gas Pumping Unit (GPU).
1-2. MAINTENANCE FORMS AND RECORDS.
Department of the Army forms and
procedures used for equipment maintenance will be those prescribed by DA PAM 738-750,
the Army Maintenance Management System (TAMMS). The DA PAM is published in
the Maintenance Management UPDATE. Units may subscribe to the Maintenance
Management UPDATE by submitting a completed DA Form 12-13.
1-3. REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR).
If
your battery charger or Gas Pumping Unit (GPU) needs improvement, let us know. Send
us an EIR. You, the user, are the only one who can tell us what you do not like about your
equipment. Let us know why you do not like the design. Tell us why a procedure is hard to
perform. Put it on an SF 368 (Quality Deficiency Report). Mail it to the address stated in
DA PAM 738-850. We’ll send you a reply.
1-4. CALIBRATION.
The Remote Pressure Measuring System (transducer and digital
readout) will be turned in to the local calibration facility for calibration/repair as
prescribed by TB 43-180 and TB 43-180-1.
Change 3 1-1