MWO 9-2330-390-35-1
C-5
APPENDIX C:
TOP AND BOTTOM BEAM AND HYDRAULIC LIFT
CYLINDER REMOVAL / INSTALLATION (Con’t).
13. Remove two cotter pins (16) flatwashers (17) and clevis pins (18) from positioning
cylinders (2) and bottom beam (3).
Discard cotter pins.
14. Remove two positioning cylinders (2) from bottom beam (3).
Place positioning cylinders
on a clean work surface.
15. Place a wooden block or other suitable support under axle assembly (7) and pivot axle
bracket (8).
16. Remove hanger brackets (front dolly).
Set aside for installation to modified structure.
17. Remove data plates (front dolly).
Set aside for installation to modified structure.
b. CLEANING AND INSPECTION