MWO 9-2330-390-35-1
C-8
APPENDIX C:
TOP AND BOTTOM BEAM AND HYDRAULIC LIFT
CYLINDER REMOVAL / INSTALLATION (Con’t).
NOTE
•
Preformed packings should be lightly coated with hydraulic fluid before
installation.
11. Install two new preformed packings (4) and straight connectors (5) on positioning
cylinders (2) inside bottom beam (3).
12. Connect two hose assemblies (6) to straight connectors (5) at positioning cylinders (2).