PS Magazine - JULY 1984

PS, The Preventative Maintenance Monthly

ISSUE 380

JULY 1984

PS Magazine - JULY 1984 - Page 20 of 35
ONE LITtE GENERATOr BRAVElY GOES
ON-All OF HER BUDDiES ARE WASTED
aND GONE .
..
Some insulated wires hAve A speciAl coAting thAt needs A speciAl kind of stripper.
For instAnce,
some wires on the BlAck
·
±
HAwk And CobrA sport coAts of
polytetrAfluoroethylene (TefLon). ReGulAr wire strippers don't hAve the preci-
sion needed to Get the insulAtion o² without cuttinG into the strAnds³
NSn
Here A´e
3
NSN's fOr wire st´ippers
thAt will work³ The
16±26
µW¶ size
stripper will Go into the next revision
of the µ YUM
#
tool set³ MeAnwhile,
use µppendix µ of CT µ
50²970
As your
Authority to order it And the other
5110-00-177-
7285
7286
7287
FOR AWG
WIRE SIZE
10±14
16±26
26-30
If your unit has not received a
message you have an interest
in, check with your next higher
headquarters.
UH-1±84±01
SOF
Maintenance
Mandatory, 1-time inspection for
defective
turnbuckle
bodies on
·
UH·1D/HIV/EH·±h/X.
302±45Z
Mar 84.
UH²60A±84±02
SOF Maintenance
Mandatory² UH³60A 1-Lime inspec·
tion
of
wire
´arness
routingµ
±61430Z Mar 84.
OH±6A±84±01
SOF Maintenance
Mandatory ±-t¶me inspection of
h·6 ta¶¸ rotor assemblies. 211400Z
Mar 84µ
J³L ´µ
OH±6A±84±03
SOF Maintenance
Mandatory²
Revision
to
com¹
p¸iance period for 1ºLime »nspec¼
tion of 0½6 ta¶l rotor assemb¸¶es.
302200Z Mar 84.
CH±47¶84²04
SOF Maintenance
Man¾atory²
¿nspect¶on
of
CH·
4 7 A/B/C/D
engine transmission
warn¶ng sysÀemÁ 232400Z Mar 84µ
CH²47±84±05
SOF Tec´nical² ¿n-
spection
of
CHÂ47D
forward
transmission
mountÃng
nutsµ
292300Z Mar 84Á
MIM±CH±54²84²MEM±02
CHÂ54A
engine torque ind¶caLionÄ 271400Z
Mar 84µ
·¸
MIM±CH±47¹84±MºM±04
C´ange
to CH·47 fiberglass rotor bla¾e
¾eÅce proce¾ureÄ 01±900Z Mar 84.
MIM»CH¼47½84¶MEM±05
Subst¶tÆÇ
t¶on skin material for fiberglass
rotor b¸ade repa¶r kitµ 072± ÈÈZ Mar
84.
É
MIM±CH±47±84¾MEM±06
CH·
47A/B/C ´ydraul¶c accumulatorsÄ
092± ÈÈZ Mar 84Ä
MIM±T53±84²MEM¶03
±ÂL¶me
inÊ
spect¶on of T·53·Ë-±3B/BA turbine
engine for sand and dust impact¼
ment
and
clearances
between
firstÂstage GP nozzle and w´eelsÄ
141545Z Mar 84Á
Cat ± EÌR P´one
:
AUTOVON 693-2006
(24 Íours)
I


Back to Top
Back to Top