MWO-9-2320-272-20-8

MODIFICATION OF 5-TON M939A2 SERIES TRUCKS

ACCELERATOR LINKAGE MODIFICATION KIT; MODIFICATION WORK ORDER

MARCH 1997

  MWO-9-2320-272-20-8 - Page 7 of 18

MWO 9-2320-272-20-8
14.
RECORDING AND REPORTING OF THE MODIFICATION.
a.
Records and Report Forms.
Refer to DA Pam 738-750, DA Pam 738-751, and TB 9-1100-803-15.
b.
Marking Equipment.
(1
)
After the Accelerator Linkage Modification Kit is installed, mark MWO number "9-2320-272-20-8" and
date applied in the MWO and date blocks on 10930014 MWO Instruction Plate as shown in figure 13.
(2
)
Install MWO data plate by drilling a 0.104-inch diameter hole (#37 drill) in cab body reinforcement panel
and secure with MS21318-20 drivescrew as shown in figure 13.
(3
)
After drivescrew is installed, flatten or remove protruding excess drivescrew material from inside of cab
body reinforcement panel.
15.
MATERIAL CHANGE (MC) NUMBER.
This MWO is authorized by MC number 1-96-06-4501.
16.
MODIFICATION IDENTIFICATION.
a.
When installed correctly, the Accelerator Linkage Modification Kit will appear as shown in figure 12.
b.
After the Accelerator Linkage Modification Kit is installed, the accelerator linkage should be tested for proper
operation. Any faults detected, or discrepancies noted, will be corrected before the vehicle is returned to
normal service.
7


Back to Top