TB 9-2320-279-13-1
0041-2
AC LOW PRESSURE SWITCH REPLACEMENT - Continued
DRAFT
INSTALLATION
NOTE
Ensure preformed packing is in place in low pressure switch prior to installation.
1. Install preformed packing (6) and low pressure switch (5) on hose (7).
Torque low pressure switch (5) to
7.5-10 ft-lbs. (10-14 N•m).
NOTE
Install cable ties as required.
2. Connect connector (3) to connector (4).
3. Connect connector (1) to connector (2).
FOLLOW-ON MAINTENANCE
1. Install skid plate grille (TM 9-2320-279-20).
2. Connect batteries (TM 9-2320-279-20).
3. Perform leak test inspection (WP 0049).
END OF WORK PACKAGE
HEMAC010