TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 121 of 396

TB 9-2320-279-13&P-3
0026-5/(6 blank)
0026
INSTALLATION - CONTINUED
4. Install wheel well assembly (4) to front panel assembly (9) with three locknuts (8), washers (7),
lockwashers (6), and screws (5).
5. Tighten three locknuts (8) to 60 lb-ft. (81 N•m).
6. Tighten three locknuts (13) to 37 lb-ft. (50 N•m).
7. Install inner wheel housing assembly (3) and secure to wheel well assembly (4) with three
lockwashers (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Connect batteries (TM 9-2320-279-20).
2. Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
END OF WORK PACKAGE


Back to Top