TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 152 of 396

TB 9-2320-279-13&P-3
0031-14
0031
REMOVAL - MODEL B (A2 VEHICLE) - CONTINUED
9. Remove rubber seal (21), plastic washer (22), and compression nut (18) from black wire (20) and white
wire (17).
10. Disconnect tank connector (23) from existing chassis harness.


Back to Top