TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 174 of 396

TB 9-2320-279-13&P-3
0031-36
0031
FOLLOW-ON MAINTENANCE
1. Install lightbar panel assembly (WP 0030).
2. Install side/rear marker lights (WP 0028).
3. Install right upper side panel assembly (WP 0019).
4. Install left upper side panel assembly (WP 0018).
5. Connect batteries (TM 9-2320-279-20).
6. Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
END OF WORK PACKAGE


Back to Top