TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 183 of 396

TB 9-2320-279-13&P-3
0034-1
0034
FIELD LEVEL MAINTENANCE
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. Two-Level Maintenance Allocation Chart for M978 Tanker Armor Module Kit.
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
FIELD
SUSTAINMENT
UNIT
DS
GS
DEPOT
GROUP
NUMBER
COMPONENT/
ASSEMBLY
MAINTENANCE
FUNCTION
C
O
F
H
D
TOOLS AND
EQUIPMENT
REF CODE
REMARKS
CODE
33
SPECIAL
PURPOSE
KITS
3307
Tanker Armor
Module Kit
Install
*
Rear Door
Assembly
Inspect
Replace
0.1
0.5
1,2,3
A
Rear Door
Deadbolt Latch
and Linch Pin
Assembly
Inspect
Replace
0.1
0.2
3A
Rear Door
Hinge
Inspect
Replace
0.1
0.4
3A
Rear Door
Check and
Hold Back
Assembly
Inspect
Service
Replace
0.1
0.1
0.4
3A
Rear Access
Door Assembly
Inspect
Replace
0.1
0.3
3A
Rear Panel
Assembly
Inspect
Install
Repair
0.1
0.9
1.7
1,2,3
A
Lower Side
Panel
Assembly (LH
and RH)
Inspect
Install
Replace
0.1
0.3
0.5
1,2,3
A
Left Upper Side
Panel
Assembly
Inspect
Install
Repair
0.1
0.6
1.1
1,2,3
A
Right Upper
Side Panel
Assembly
Inspect
Install
Repair
0.1
0.6
1.1
1,2,3
A


Back to Top