4
1
2
3
LIFTING
DEVICE
Figure 4.
4. With the aid of an assistant and lifting device, install ramp assembly (1) on frame (4) with ten screws (3) and
locknuts (2).
5. Remove lifting device from ramp assembly (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
TB 9-2320-279-13&P-4
0051
0051-5/(6 blank)