TB-9-2320-302-13-P-1

CREW PROTECTION KIT PART 1 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

NOVEMBER 2006

  TB-9-2320-302-13-P-1 - Page 287 of 380

Installation Manual – P/N 0257550622-00
(Doc No.:
II
113500-1 D)
Freightliner M915 / M916 -
Crew Protection Kit
Page 95 of 125
Fasteners:
Find No.
(Table 6.2)
Part No.
Description
Size
Quantity
None
Special Tools/ Materials
Description:
Vendor/Part-Number:
None
5.22.2
Installation Instructions
1.
Prepare all surfaces to receive the foam insulation panels by cleaning the surfaces with a
mild detergent.
Allow them to dry before installing the foam.
2.
Installation order is not critical.
3.
Select a piece of foam insulation.
Peel the plastic backing from the foam adhesive side.
Align the foam with the surface to be covered.
Place one edge of the foam on the surface
to be covered and apply pressure, working across the foam in a continuous direction to
minimize wrinkles and air entrapment.
4.
Repeat for each part.


Back to Top