TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 329 of 396

ArmorWorks
18. Install the frame adjustment hardware - 5/16-18 x 2 bolts, hex jam nut and washer - above
and below the hinge as shown.
Tighten the bolts to reinforce the Mounting Frame within the
channel.
Tighten the jam nuts to prevent loosening.
0040 00-13


Back to Top