TB-9-2320-302-13-P-3

CREW PROTECTION KIT; AIR CONDITIONING KIT PART 3 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT, AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 2008

  TB-9-2320-302-13-P-3 - Page 157 of 240

TB 9-2320-302-13&P-3
A/C WIRING HARNESS REPLACEMENT - CONTINUED
0021 00
0021 00-7
REMOVAL - CONTINUED
21.
Remove two screws (42), chassis wiring harness connector (43) (red wire), chassis wiring harness connector (44) (pur-
ple wire), and chassis wiring harness (30) from engine coolant temperature switch (45).
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0014 00).
INSTALLATION
NOTE
Install wires and wiring harness as tagged at removal.
During installation, route wiring harnesses as noted during removal.
1.
Install chassis wiring harness (30), chassis wiring harness connector (44) (purple wire), chassis wiring harness connec-
tor (43) (red wire), and two screws (42) on engine coolant temperature switch (45).
2.
Install diode assembly (39), diode connector (35), locknut (36), and bolt (37) on vehicle.
3.
Connect diode assembly connector (38) to compressor cable (34).
4.
Connect diode assembly connector (40) to chassis wiring harness (30).
5.
Install new tiedown straps (41) on chassis wiring harness (30) along A/C hoses to compressor.
449-063
42
43
30
44
45


Back to Top