TB-9-2320-302-13-P-3

CREW PROTECTION KIT; AIR CONDITIONING KIT PART 3 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT, AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 2008

  TB-9-2320-302-13-P-3 - Page 160 of 240

TB 9-2320-302-13&P-3
A/C WIRING HARNESS REPLACEMENT - CONTINUED
0021 00
0021 00-10
INSTALLATION - CONTINUED
16.
Connect power relay connector (8) to power relay (9).
17.
Install washer (11) and screw (10) on power relay (9).
18.
Install fuse (7) on power relay harness (1) and new tiedown straps (6) to exposed wiring.
19.
Install two black wire connectors (5) and screw (12) on ground connection.
449-081
12
10,11
9
8
5
6,7
1
(HIDDEN)


Back to Top