TB-9-2350-368-25

M113A2/M113A3/M548Al/M548A3 FAMILY OF VEHICLES INCLUDING OPPOSING FORCES SURROGATE VEHICLE (OSV)

FABRICATION AND OPERATION OF POWERPLANT TEST STAND

FEBRUARY 2003

  TB-9-2350-368-25 - Page 48 of 120

TB 9-2350-368-25
2-34
d. Regulator Cable (Three Leads)
Bill Of Materials
Item
Nomenclature
Part Number
NSN
Qty
1
Shell Assembly
8724262
1
2
Nut
7716634-1
1
3
Grommet
10874855
1
4
Nut
7723309
1
5
Electrical Wire
M13486/1-5
or
A/R
6
Band Marker
M43436/1-1
6
7
Terminal
MS25036-153
2
8
Electrical Connector Shell
8338566
1
9
Slotted Washer
8338567
1
10
Electrical Contact
MS27148-2
1
11
Electrical Insulation Tape
07099 - MS70T09-S
A/R
Electrical Insulation Sleeving
78286-S6132-
61003-9
A/R
NOTE
See Figure 2-21 for regulator cable art.
1. Measure from the regulator to power buss bar and to accessory cable circuit lead 1B.
2. Connect three AWG 14 electrical leads (5), two or three inches longer than measurement in step 1, to
receptacle (1-4).
3. Label leads (5), using band markers (7), from pin F, 1B; pin C, 2; and pin A, 2A.
4. Add connector (8), slotted washer (9), and electrical contact (10) to end of circuit lead 1B.
5. Add terminal (7) to ends of circuit leads 2 and 2A.
6. Install electrical insulation tape/sleeving (11) on all leads (5).


Back to Top