TB-9-2350-368-25

M113A2/M113A3/M548Al/M548A3 FAMILY OF VEHICLES INCLUDING OPPOSING FORCES SURROGATE VEHICLE (OSV)

FABRICATION AND OPERATION OF POWERPLANT TEST STAND

FEBRUARY 2003

  TB-9-2350-368-25 - Page 52 of 120

TB 9-2350-368-25
2-38
f. Transmission Cable
Bill Of Materials
Item
Nomenclature
Part Number
NSN
Qty
1
Electrical Plug Connector
MS3100R24-7S
1
2
Electrical Wire
M13486/1-11
A/R
3
Electrical Insulation Tape
07099 - MS70T09-S
A/R
Electrical Insulation Sleeving
78286-S6132-
61003-9
A/R
4
Band Marker
M43436/1-1
14
1. Measure from the M113A3 engine harness to instrument panel/box.
2. Connect seven AWG 4 electrical leads (2) measured in step 1, to electrical plug connector (1).
3. Label leads (2), using band markers (4), from pin A, 364; pin B, 363; pin C, 362; pin D, 361; pin E, 360;
pin F, 359; and pin G, 358.
4. Install electrical insulation tape/sleeving (3) on all leads (2). See Figure 2-23.
Figure 2-23. Transmission Cable


Back to Top