TB-9-2350-369-20-1

M113A3 FOV CARRIERS, M113A2 FOV CARRIERS, M548A1/A3 CARRIERS AND OSV/MBT VEHICLEs

TECHNICAL BULLETIN; INSTRUCTIONS TO CONVERT T130E1 TRACK TO T150F TRACK USING KIT 57K4269

FEBRUARY 2007

  TB-9-2350-369-20-1 - Page 12 of 40

TB 9-2350-369-20-1
INTRODUCTION (continued)
0001 00
Not included in kit or 57K4269 but will be needed if being applied to a M981 or M901A1 for
mounting the track stowage brackets.
NSN
NOMENCLATURE
CAGEC
PART NO.
QUANTITY
Screw
80204
B1821BH050C350N
4
(3)
Bulk and Expendable Material. Not Applicable.
(4)
Parts Disposition.
Parts removed and not reinstalled are considered excess for kit application.
Excess parts may be reused on another depot overhaul program or otherwise disposed of in
accordance with AR 725-50 or local salvage regulations.
T130 E1 track removed from vehicle
will be inspected and classified
IAW TM 9-2530-200-24 dated, March 2006. Refer
to Table 1,
listed in WP 0002 00.
h. Special Tools; Tool Kits; Jigs; Test, Measurement and Diagnostic Equipment (TMDE), and Fixtures
Required. Common hand tools (wrenches, sockets, screwdrivers); metal cutting tools (drill bits, taps,
saws); and other tools (drills, grinders, shop equipment) are furnished by the maintenance
shop/contractor.
REQUIRED COMMON TOOLS FOR INSTALLATION
NSN
NOMENCLATURE
CAGEC
PART NO.
QUANITY
Crowbar
19207
11655778-5
1
Grease Gun
19207
10915142
1
Hammer 2 lb
19207
11677028-3
1
OR
Hammer 4 lb
1CV05
1435G
1
Adjustable Wrench
19207
11655778-5
1
Track Fixture
19207
12253183
2
Industrial Goggles
19207
-
1
Gen. Mechanics Tool
Kit
19207
-
1
i.
Modification Procedures. Refer to Modifications Procedures/Sequencing Work package for compliance.
j.
Calibration Requirements.
No calibration is required of the modified vehicle.
k. Weight and Balance Data.
Weight and balance are not significantly affected.
l.
Quality Assurance Requirements.
(1)
Perform Quality Assurance inspections to verify requirements of paragraph i, which define the
minimum inspections to be performed.
Documented Quality evidence of inspections performed and
compliance with requirements will be accomplished as specified by the maintenance Quality activity.
(2)
Inspection.
(a)
In-process Inspection. Perform monitoring-type inspection of processes to assure compliance
with requirements.
The following items can only be monitored prior to completion of other
steps.
1
Ensure track assemblies for T150F track have correct number of track shoes (63 left side,
64 right side M113A2 FOV, M113A3 FOV and OSV; 66 left and right side M548A1/A3).
2
Ensure rework of components is accomplished in their workstations IAW requirements of
TB.
m.
Recording and Reporting of the Modification. Refer to DA Pamphlet 738-750.
(1)
Marking Equipment.
Not applicable.
n. Material Change (MC) Number. Not applicable.
o. Modification Identification.
Not applicable.
END OF WORK PACKAGE
0001 00-4


Back to Top