TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 146 of 704

TB 9-3950-253-13&P
0016-2
0016
Table 1.
Operator Preventive Maintenance Checks and Services (PMCS),
Including Lubrication Instructions for the E-CHU.
ITEM
NO.
INTERVAL
LOCATION
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:
ITEM TO
CHECK/
SERVICE
NOTE
• Review all WARNINGs, CAUTIONs, and NOTEs before per-
forming PMCS on the E-CHU.
• If you are operating E-CHU for the first time, perform your
Weekly
and
Monthly
PMCS the first time you do your
Before
PMCS.
• If performing
Weekly
PMCS and E-CHU has not been operated
in a week, perform
Before
PMCS at the same time.
• If performing
Monthly
PMCS and E-CHU has not been operated
in a month, perform
After
PMCS at the same time.
• Unless otherwise indicated, perform preventive maintenance
and lubrication with vehicle, parked on level ground, engine shut
down, and parking brake applied.
• Begin walkaround inspection at left side of stowage assembly
and proceed in a counterclockwise direction.
STOWAGE
ASSEMBLY
LEFT SIDE
1
Before
Overall View
a. Check for hydraulic fluid under
stowage assembly. If hydraulic fluid is
found, identify source of leak.
Any Class III hydraulic fluid
leaks are visible.
b. Check stowage assembly for signs
of tampering, damage, and missing
parts.
Stowage assembly
inoperative due to tampering,
damage or missing parts.
c. Remove any dirt or debris in and
around stowage assembly.


Back to Top