TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 151 of 704

0016-7
TB 9-3950-253-13&P
0016
SLIDER
ASSEMBLY
REAR
7
Before
Slider Beam
Check slider beam for excessive
damage/wear, cracks, and loose or
missing hardware.
Slider beam is excessively
damaged/worn, cracked, or
hardware is loose or missing.
8
Before
Horizontal and
Angled Rollers
Rotate horizontal and angled rollers to
verify that rollers rotate freely. Notify
Field Maintenance if one or more
rollers do not rotate freely.
9
Before
Main Pivot
Check main pivot for excessive
damage/wear, cracks, and loose or
missing hardware
Main pivot is excessively
damaged/worn, cracked, or
hardware is loose or missing.
Figure 5.
Slider Beam.
016
Table 1.
Operator Preventive Maintenance Checks and Services (PMCS),
Including Lubrication Instructions for the E-CHU - Continued.
ITEM
NO.
INTERVAL
LOCATION
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:
ITEM TO
CHECK/
SERVICE
ANGLED
ROLLER
HORIZONTAL
ROLLER
SLIDER
BEAM
MAIN PIVOT


Back to Top