TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 31 of 704

0002-5/(6 Blank)
Change 1
0002
TB 9-3950-253-13&P
LOCATION AND DESCRIPTION OF MAJOR COMPONENTS – CONTINUED
Figure 4.
Right-Side View.
02
END OF WORK PACKAGE
KEY
COMPONENT
DESCRIPTION
22
Bail Bar Lock
Installed on hook when lift frame is engaged, to prevent lift
frame from disengaging hook. Use is mandatory.


Back to Top