TM-1-4940-355-12-P

SHOP EQUIPMENT CONTACT MAINTENANCE (SECM) P/N 50154-001, MOUNTED ON HIGH MOBILITY MULTI PURPOSE WHEELED VEHICLE (HMMWV) HEAVY (HVY) MODEL M1097A2

TECHNICAL MANUAL; OPERATOR’S AND UNIT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

SEPTEMBER 2003

  TM-1-4940-355-12-P - Page 47 of 164

TM 1-4940-355-12&P
0013 00
SHOP EQUIPMENT CONTACT MAINTENANCE (SECM)
MAIN BOX COMPONENT
INITIAL SETUP
Tools And Special Tools:
Tool Kit Acft. Maint, B01 (Table 2, WP 0025 00)
Materials/Parts:
MIL-P-23377, Primer (Item 8, WP 0031 00)
MIL-C-22750, Number 34094 (Green 383) (Item 9,
WP 0031 00)
Number 8802 extrudable sealant (Item 4, WP 0031
00)
Personnel Required:
One MOS 67 Series or MOS 68 Series
References:
TM 1-1500-204-23-10
Repair Parts and Special Tools List (WP 0027 00)
TM 43-0139
Equipment Conditions:
Side boxes, Overhead Rack and Main Box removed
from HMMWV (WP 0012 00)
DISASSEMBLY
NOTE
Only disassemble as far as necessary to get to the part to be replaced.
NOTE
Contents must be removed from Main Box prior to disassembly.
1.
Remove 30 rivets (1), 6 handles (2) and 6 backing plates (3) from sides and front of main box assembly.
(Figure 1)
2.
Remove tie down straps (4) from shelves (5 and 6).
3.
Lift and remove back shelf (5) and front shelf (6).
4.
Remove 8 shelf brackets (7).
5.
Remove storage tray (8).
6.
Remove Velcro (9).
7.
Remove 24 rivets (10) and 4 shelf supports (11).
8.
Remove 12 rivets (12) and 4 shelf supports (13).
9.
Slide rear mounting bar (14) out the side of main box assembly.
REPAIR OR REPLACEMENT
Bonded Panel Repairs
NOTE
Core material used in these panels is end core balsa, with a thickness of 0.25 in.
1.
Bonded panel repairs will be completed in accordance with Chapter 9 of TM 1-1500-204-23-10.
Material
listing for repair supplies will be found in WP 0031 00.
0013 00-1


Back to Top