TM-5-2330-325-13-P

SEMITRAILER, MEDIUM HEAVY EQUIPMENT TRANSPORTER (MHET), 40 TON, M870A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-2330-325-13-P - Page 313 of 648

FIELD MAINTENANCE
AIR RESERVOIR SERVICEABILITY TEST
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's
(WP 0144, Table 1, Item 16)
Materials/Parts
Detergent, General Purpose
(WP 0143, Table 1, Item 8)
SERVICEABILITY TEST
1.
With air brake system connected to towing vehicle, coat connections with a solution of detergent and water.
No leakage is permissible.
2.
Tighten any leaking connections.
3.
Inspect air reservoir for damage or corrosion. Replace air reservoir if it leaks or if there is any damage or
corrosion that could weaken air reservoir.
END OF TASK
END OF WORK PACKAGE
TM 5-2330-325-13&P
0066
0066-1/blank


Back to Top