TM-5-2330-325-13-P

SEMITRAILER, MEDIUM HEAVY EQUIPMENT TRANSPORTER (MHET), 40 TON, M870A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-2330-325-13-P - Page 354 of 648

REMOVAL
1.
Release all pressure from hydraulic lines by disconnecting gooseneck hydraulics from power.
CAUTION
Cap or plug all ports and hose ends to prevent contamination of hydraulic oil. Failure to
comply may result in damage to, or destruction of, equipment or mission.
NOTE
Tag all wires, hoses, tubing, and connections prior to removal for ease of installation.
2.
Disconnect five hydraulic lines (Figure 1, Item 4) from rear and side of control valve (Figure 1, Item 1) inlet
and outlet ports and cap or tape closed openings in ports and lines.
3.
Tag and disconnect hydraulic line (Figure 1, Item 3) from pressure gage (Figure 1, Item 2).
4.
Loosen and remove three mounting bolts (Figure 1, Item 5), washers (Figure 1, Item 6), and self-locking
nuts (Figure 1, Item 7) securing hydraulic control valve (Figure 1, Item 1) to gooseneck and remove control
valve (Figure 1, Item 1) and pressure gage (Figure 1, Item 2). Discard self-locking nuts (Figure 1, Item 7).
5.
Loosen and separate pressure gage (Figure 1, Item 2) from control valve (Figure 1, Item 1).
466-0085
4
5, 6, 7
2
3
4
1
4
Figure 1.
Hydraulic Control Valve and Pressure Gage Replacement.
END OF TASK
DISASSEMBLY
Remove all fittings from hydraulic control valve.
END OF TASK
TM 5-2330-325-13&P
0076
0076-2


Back to Top