TM-5-2330-325-13-P

SEMITRAILER, MEDIUM HEAVY EQUIPMENT TRANSPORTER (MHET), 40 TON, M870A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-2330-325-13-P - Page 395 of 648

FIELD MAINTENANCE
MUD FLAP REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's
(WP 0144, Table 1, Item 16)
Materials/Parts
Nut, Self-Locking
Materials/Parts (cont.)
Qty: (4) WP 0129, Figure 32, Item 4
Equipment Condition
Semitrailer parked on level ground (WP 0005)
NOTE
There are two mud flaps on semitrailer, this procedure replaces one mud flap. The other
mud flap is replaced the same.
REMOVAL
1.
Remove four self-locking nuts (Figure 1, Item 3) and washers (Figure 1, Item 4) behind bracket
(Figure 1, Item 1). Discard self-locking nuts (Figure 1, Item 3).
2.
Remove four screws (Figure 1, Item 6), bracket (Figure 1, Item 1), and mud flap (Figure 1, Item 2) from
semitrailer frame (Figure 1, Item 5).
3
4
5
6
2
1
466-0088
Figure 1.
Mud Flap Removal.
END OF TASK