TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 71 of 319

TM 5-2350-262-20-3
3-36
3
Clear obstructions and
repair mechanical damage.
To block 7
NO
YES
YES
NO
YES
NO
1
Check apron for interference.
Is the apron binding or jammed as a
result of damage to apron or hull?
2
Perform apron control valve
pressure test.
Is hydraulic pressure at circuit 19
less than 2,000 psi (13,790 kPa)?
4
Perform relief valve adjustment.
Can circuit 19 relief valve be set to develop
3,500 psi (24,131 kPa)?
3
APRON WILL NOT RAISE (CONTINUED)
5
Verify problem is solved.
6
Replace directional control valve
bank.


Back to Top