TM-5-2350-377-13-P

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST SUPPORTING THE HYDRAULIC BLADE FOLDER-TRACK TENSIONER

JUNE 2012

  TM-5-2350-377-13-P - Page 117 of 404

FIELD MAINTENANCE
FIELD PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
Personnel Required
Construction Equipment Repairer, 91L
References
WP
0018
Table
1.
Field Preventive Maintenance Checks and Services (PMCS).
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
NOTE
Perform Operator PMCS (WP
0018) prior to
or along with Field PMCS.
1
Semi-
annually
Track Adjusting
Cylinders
Check cylinders for cracks, leaks, and loose or missing
hardware.
Class III leaks, or
damaged.
2
Semi-
annually
Track Adjusting
Hydraulic
Manifold
Check manifold assembly for cracks, leaks, or loose or
missing hardware.
Class III leaks, or
damaged.
PMCS MANDATORY REPLACEMENT PARTS
There are no mandatory replacement parts for these PMCS procedures.
END OF TASK
END OF WORK PACKAGE
TM 5-2350-377-13&P
0020
0020-1/2 blank


Back to Top