TM 5-2350-377-14&P
END OF WORK PACKAGE
SPECIFIC PMCS PROCEDURES - continued
Table 11-1.
Operator/Crew Preventative Maintenance Checks and Services for M9 ACE.
EQUIPMENT
NOT READY/
AVAILABLE IF:
ITEM
NO.
PROCEDURE
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
5
6
Quarterly
Quarterly
Apron
Dozer Blade
Check lifting eye and tiedown
shackles for damage.
Lubricate
with PL-M or PL-S.
Check latched and lockpins for
damage.
Lubricate with PL-M or
PL-S.
DOZER
PIVOT
PINS
DOZER
LOCKPINS
DOZER BLADE
AND PIN
LIFTING EYE
SHACKLES
DOZER
LATCHES
APRON
LOCKPINS
TIEDOWN
SHACKLES
0011 00
0011 00-3/4 blank