TM 5--2350--378--24&P
0024 00--3
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INSTRUCTIONS --
Continued
0024 00
Table 1. Unit Level Preventive Maintenance Check and Services for
M9 ACE HDC System -- Continued
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
4
Weekly
HDC System
Electrical Components
a.
Check that all HDC electrical
connections and connectors
are clean and tight.
b.
Check condition of HDC
Control Box and Umbilical
Cable Assembly W4.
Any condition would
prevent safe
operation of vehicle.
Figure 3. HDC Control Box
c.
Check condition of HDC
Upper Cable Assembly W2
and Lower Cable Assembly
W3.
d.
Check HDC system solenoid
valves and pressure transducer
electrical connectors for
proper connections and tight
fit. Tighten as required.
Any condition would
prevent safe
operation of vehicle.