TM 5-3805-254-20-1
ORGANIZATIONAL TROUBLESHOOTING - CONTINUED
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 4.Set multimeter to 20 vdc scale.
Connect red test lead to socket end (9) and black test lead
to ground.
Rotate DOME/PNL light switch (7) until click is felt.
Check for 11 to 13 vdc on
multimeter.
Rotate DOME/PNL light switch (7) to dim position.
Disconnect test leads.
a.
If multimeter does not read 11 to 13 vdc, lamp (10) must
be replaced (page 2-719).
b.
If multimeter reads 11 to 13 vdc, go to step 5.
2-291