TM 5-3805-254-34
9-5.
REAR-REAR DIFFERENTIAL MAINTENANCE (Con’t).
13.
Wrap
strong
twine
around
pinion
(74)
of
cross-shaft (60) and pull on horizontal line with
spring scale.
Preload torque should be 5-15 lb.-
in.
(0.5-1.7 N-m).
14.
If preload torque Is not correct, remove six bolts
(53) and bearing retainer plate (52).
Add shims
(51) to decrease preload torque or remove
shims to Increase preload torque.
TA703983
9-52