TM 5-3895-372-10
Table 3-1. Operator/Crew Preventive Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
W - Weekly
M - Monthly
OPERATOR PMCS - M919 CONCRETE MOBILE MIXER BODY
Item
Interval
ITEM TO BE INSPECTED
FOR READINESS REPORTING
Procedure: Check For And Have Repaired
Equipment is not Ready/
No.
B
D
A
W
M
Filled Or Adjusted As Needed
Available If:
46
•
Check low flow and hi-flow
Class III leaks are evident.
tanks for leaks.
47
•
Unless told otherwise, drain and flush liquid
admix tanks at the end of the day.
48
•
Check air pressure gage for
Gage inoperative or 15
15 PSI set with air regulator.
PSI cannot be obtained.
49
•
Check sight gage on tank.
TA 075538