TM 5-3895-372-10
NOTE
ALWAYS USE CLOSEST TENTH
WHEN
USING
THIS
GRAPH
EXAMPLE 21.7 USE 22
Figure 2-5. Stone Dial Setting Graph.
g. Hi-Flow Admix Worksheet.
(See fig. 2-6.)
CAUTION
The filled out worksheet are only examples. Do not use them to make concrete.
(1) This system is calibrated in qt min and solution is usually added to concrete at a certain amount per bag of
cement, or per pound of cement. Therefore, it is necessary to know how many bags of cement are discharged from the
mixer unit in one minute (2 answer C, fig. 2-6).
TA 075471
2-8