TM 5-3895-372-10
Table 3-1. Operator/Crew Preventive Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
W - Weekly
M - Monthly
OPERATOR PMCS - M919 CONCRETE MOBILE MIXER BODY
Item
Interval
ITEM TO BE INSPECTED
FOR READINESS REPORTING
Procedure: Check For And Have Repaired
Equipment is not Ready/
No.
B
D
A
W
M
Filled Or Adjusted As Needed
Available If:
NOTE
Bins must be empty during the following
check.
17
•
Check sand and stone gates for ease of
operation.
CEMENT BIN
18
•
Check that top of cement bin and
cement screen are clean.
TA 075525