FIELD MAINTENANCE
CONTROL VALVE REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(WP
0078, Table 2, Item 2)
Materials/Parts
Cotter Pin (WP
0082, Table 1, Item 31) Qty:
1
Lockwasher (WP
0082, Table 1, Item 41) Qty:
2
Lockwasher (WP
0082, Table 1, Item 43) Qty:
4
References
Parts Manual (WP
0073, Figure 26)
Equipment Condition
Load removed from the BAP. (WP
0008)
BAP unloaded from the CBT. (WP
0006)
REMOVAL
1.
Release safety pin (Figure 1, Item 1) from valve bracket (Figure 1, Item 2) and lever (Figure 1, Item 3).
TM 5-3990-263-13&P
0063
0063-1