TM 5-4210-249-13&P-1
0125-11
DRAFT
0125
TFFT02723
Step 12.
Install circuit breaker 12 (WP 0398).
Remove pump house panel S
(WP 0540).
Open
pump house power distribution box (WP 0412). Remove circuit breaker P2 (WP 0412).
Check for continuity across circuit breaker.
If there is no continuity, replace circuit breaker P2 (WP 0412).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION