TM 5-4210-249-13&P-1
0100-5/(6 blank)
DRAFT
0100
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
TFFT04143
Step 5.
Operate foam system from pump operator’s panel (WP 0033).
Push NO. 1 DRIVER
SIDE DISCHARGE valve control FLOW button (WP 0004).
Ensure that manual
metering valve is set to match output of NO. 1 DRIVER SIDE DISCHARGE valve
control (WP 0033).
Set manual metering control valve to proper adjustment using
manual metering control valve data plate valve settings.
Check if foam is delivered
when system is operated.
Turn off foam system (WP 0033).
Flush foam
system (WP 0032).
a.
If foam is delivered, fault corrected.
b.
If foam is not delivered, replace manual metering valve (WP 0291).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION