TM 5-4210-249-13&P-1
0116-5
DRAFT
0116
TFFT03778
Step 4.
Inspect air lines, from roof turret control valve to roof turret shutoff valve for leaks, kinks,
or damage.
If air lines are not free from leaks, kinks, or damage, replace damaged air
lines (WP 0567).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION