TM 5-4210-249-13&P-2
0215-8
DRAFT
0215
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7.
Open two shutoff valves (24) and (23).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8.
Install wiring harness (22) and clamp (21) on cover (12) with screw (20).
9.
Install connectors (18) and (17) on blower motor assembly (19).
TFFT018664
TFFT00687