TM 5-4210-249-13&P-2
0219-10
DRAFT
0219
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
33. Remove four locknuts (92), two U-bolts (93), cradles (94), and foam system manual metering valve (95) from
bracket (96).
Discard locknuts.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
34. Loosen clamp (97) and remove pipe (98) from pump house heater assembly (99).
35. Remove nut (100), washer (101), and cable (102) from terminal (103).
END OF TASK
TFFT02132
TFFT01545