TM 5-4210-249-13&P-2
0230-4
DRAFT
0230
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Install hose (5) on charge air cooler (6) and intake tube (7) with two clamps (4).
6.
Install ducting (2) on charge air duct (3) with two clamps (1).
NOTE
•
Use the suggested tension setting for initial tensioning.
When belt is installed, run water
pump engine under load for 15 minutes, shut down and readjust belt tension.
•
Adjust belt tension to within +/- 11 lb-ft (49 N) of recommended tension.
7.
Start pump engine and run under load for 15 minutes.
8.
Shut down engine and readjust belt tension to 67 lb-ft (298 N), as indicated by belt tensioner gauge.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close passenger side crew cab access panel (WP 0499)
2.
Close pump operator’s panel housing (WP 0325)
3.
Install pump house panel U (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT00909