TM 5-4210-249-13&P-2
0241-4
DRAFT
0241
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Install muffler guard (10) on two U-bolts (13) with four locknuts (12).
5.
Install water pump engine muffler (4) on exhaust pipe (5).
6.
Install muffler guard (10) on pump house panel I (11) with four screws (9), eight washers (8), four
lockwashers (7), and nuts (6).
7.
Install clamp (3) on water pump engine muffler (4) and exhaust pipe (5) with two screws (2) and locknuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Close pump house panel A (WP 0539)
END OF TASK
END OF WORK PACKAGE
TFFT00252