TM 5-4210-249-13&P-2
0242-1
DRAFT
0242
FIELD LEVEL MAINTENANCE
WATER PUMP ENGINE NOISE PANELS REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Engine components become hot during normal operation.
Allow engine to cool
completely prior to performing this task.
Failure to comply could result in serious
injury to personnel.
1.
Remove three screws (1) and lockwashers (2) from noise panel (3) and water pump engine frame (4).
Discard lockwashers.
NOTE
Note position of washers prior to removal to ensure proper installation.
2.
Remove three screws (5), lockwashers (6), washers (7), and noise panel (3) from water pump engine
frame (4).
Discard lockwashers.
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01004
WARNING
ICON 13
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Lockwasher (6)
References
WP 0615, Fig. 12
Equipment Conditions
Pump house panels S and U removed (WP 0540)
Pump operator’s panel housing opened
(WP 0325)