TM 5-4210-249-13&P-2
0245-2
DRAFT
0245
INSTALLATION
1.
Install oil pressure sending unit (2) and preformed packing (3) in base (4).
2.
Connect connector (1) to oil pressure sending unit (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect batteries (TM 9-2320-325-14&P)
2.
Start water pump engine and check for oil leaks (WP 0022)
END OF TASK
END OF WORK PACKAGE
TFFT00757